Central nuclear de Lemóniz Historical milestone · Lemoiz, Plentzia-Mungia, Bizkaia Nuclear power plant whose construction was begun by Iberduero in 1972 at the Basordas cove. ETA, opposed to the plan to build nuclear plants along the Basque coast, murdered nine people connected with the works between 1978 and 1982, among them the engineers José María Ryan (January 1981) and Ángel Pascual Múgica (5 May 1982). The plant was halted, having never entered service, by the nuclear moratorium of the 1983 National Energy Plan, approved on 28 March 1984. 1972 (inicio de la construcción); 1978-1982 (atentados de ETA); 28 de marzo de 1984 (moratoria nuclear) Photo: Jose A. Solís (Mirir) (Public domain) What to see and do in Lemoiz